
a specialised provider of a entire range of chains, sprockets, gears, gear racks, V-belts, couplings and reducers. Our products are produced by contemporary computerized machinery and gear. The team has taken part in the producing and revising of ISO/TC100 global chain common numerous a long time in success and hosted the sixteenth ISO/TC100 Global annual conference in 2004.
Very good sealing amp EPT Services Daily life EPT Kneader
one . Organization Data
usa-usa nga EPT Firm
Natukod niadtong 1997, ang EPTngdao Ouli EPT CO., LTD nahimutang sa EPTngdao District, sa kasadpang baybayon sa siyudad sa EPTngdao, probinsya sa ZheJiang, EPT.
Branches in HangEPT , HangEPT etc had been EPTd in 2012 and 2015 .
We are EPTized in rubber EPTry planning,manufacturing and upkeep performs
Mga pangunang produkto sa EPT:
EPT miXiHu (West Lake) Dis.ng equipment / EPT vulcanizing EPT / EPT and semi-automatic waste tire recycling equipment / EPT calendaring EPT / EPT extruding gear / Reclaimed rubber production line
Our EPTs have been exported to more than 20 international locations such as America, Canada, Australia, SouthEPT Asia, Center EPT,Brazil .
We warmly welcome buyers check out factory and EPT dialogue is hugely appreciated .
one-2 EPT workshop
two. Item INTRODUCTION
2-1. Fundamental introduction
EPT kneaEPTis primarily used for organic rubber, artificial rubber, plastic, rubber and plastic refining and miXiHu (West Lake) Dis.ng, rubber and plastic blending, also ideal for various varieties of reduced viscosity materials of mixing.Great high quality with sensible value.
Operasyon sa EPT nga walay hasol nga pagmentinar.
Low labor depth and minimal vitality intake.
two-2. Functions
PARA SA DUGANG NGA IMPORMASYON: WWW.EPT-EPT.COM
two-three. Parameter
| Parametro/disenyo | X(S)N-tulo | X(S)N-20 | X(S)N-35 | X(S)N-singkwenta singko | X(S)N-kapitoan ug lima | X(S)Na usa ka gatos ug napulo |
| Bug-os nga gidaghanon (L) | 8 | 45 | 80 | usa ka gatos ug baynte singko | usa ka gatos ug kapitoan ug lima | 250 |
| Gidaghanon sa trabaho (L) | tulo | baynte | 35 | 55 | setenta singko | usa ka gatos ug napulo |
| EPT EPT (KW) | 7.5 | 37 | 55 | setenta singko | usa ka gatos ug napulo | 185 |
| Motor nga nagkiling EPT (KW) | .55 | 1.lima | duha.2 | 2.2 | 4. | 7.5 |
| Anggulo sa pagkiling (deg) | 140 | usa ka gatos ug kwarenta | usa ka gatos ug kwarenta | usa ka gatos ug kwarenta | usa ka gatos ug kwarenta | usa ka gatos ug kwarenta |
| Katulin sa rotor (r/min) | 32/baynte singko | 32/26.5 | 32/24.5 | 32/26 | 32/26 | 30/24.5 |
| Kusog sa gikompres nga hangin (MPa) | pito-siyam | unom-walo | .unom-.8 | .6-.walo | unom-walo | .6-.8 |
| Abilidad sa gikompres nga hangin (m3/min) | ge0.3 | ge0.7 | ge0.9 | ge1. | ge1.3 | ge1.6 |
| Presyon sa makapabugnaw nga tubig nga mainom (MPa) | .2-.upat | .2-.upat | .tulo-.4 | .3-.4 | .3-.upat | .3-.4 |
| TimbangEPT (kg) | 1038 | 4437 | 6500 | 7850 | 15710 | 14200 |
2-4. Configuration
MiXiHu (West Lake) Dis.ng chamber:
It is composed of a quotW quot form body and two facet boards made of high quality steel plates by signifies of extrusion forming and welding, which are jacked to take the circulation of cooling h2o or steam. It is plated with tough chrome on its interior walls.
Pagsukol sa Init:
There is a plug-in thermal resistance in center EPT of the base of the chamber to be related to EPT method to inspect and display the temperate.
Rotor:
It is created to the hollow blades of Banbury kind. The hollows are linked with aXiHu (West Lake) Dis.al hole of rotor shaft used as cooling or heating passage. The prime edges of blades and the end faces of ~ rotor shaft are area welded with cobalt-foundation challenging alloy and grinding, then plating with hard chrome and poEPTng.
Sistema sa pagpabugnaw/pagpainit:
A frequent piping system is adopted for both cooling or heating content in miXiHu (West Lake) Dis.ng operation. By means of the method cooling drinking water or steam is fed in 3 waEPTto the cavities of the rotors blades, the miXiHu (West Lake) Dis.ng chamber and the leading ram.
Mekanismo sa pagkiling:
It is made up of a rotor with brake, cycloidal EPT EPT, TP type worm and worm EPT, and so forth…It is ready to actuate the miXiHu (West Lake) Dis.ng chamber tilting by one hundred forty deg About the entrance rotors.
Gamot sa pagsilyo sa abog:
At the joint between the prime of the miXiHu (West Lake) Dis.ng chamber and the cantiEPTed arm of the EPT frame, the dust sealing assemblies with curved slotted partings are utilised obXiHu (West Lake) Dis.Hu (West Lake) Dis. an outstanding and trustworthy sealing goal.
The stop experience of the rotor is sealed by finish contact sealing with nor oil-lubrication and is seals well and is wear-resistant and sturdy.
Panguna nga teknik sa pagmaneho:
The portion is created up with main motor, EPT, connecting EPTs. It realizes odd-pace rotation of the rotors with operating encounter a single other.
Programa sa pagkontrol sa pneumatiko:
Pneumatic control program is controlled by XG get. The bi-directional air cylinEPTmakes the ram up or down. In circumstance the in excess of load takes place in the miXiHu (West Lake) Dis.ng chamber, the leading ram can be elevated automatically or manually if essential, so as to protect motor from overload.
Electrical control technique:
EPTorted PLC device and electrical handle factors which are all EPTed items or EPTed EPT merchandise are adopted in the electric handle program as to raise handle dependability.
2-five. Sample images
three. Client Opinions
upat. EKSIBIBSYON
lima. EPTAGE UG Shipping
unom. Mga Kanunayng Pangutana
Q1: Ngano nga Kami ang among pilion?
one.Much more than twenty a long time background of EPT EPT manufacturing unit.
6-8 many years international income knowledge employees, far more effectiveness and specialist.
Engineers oversea services more than twenty nations .
duha.ISO:9001,CE,BV nga sertipikasyon pagdawat
3.Support well timed, Promise to give remedy within twelve several hours,Promise buyer problems free of charge.
4.Quick shipping and delivery date, No hold off. Acknowledge urgent orEPTfor prompt shipment.
Q2:What about shipping and delivery date?
It will be in accordance to the amount of EPTs. Usually EPTs will be cargo inside 20-30 daEPTafter get deposit, No delay.
Pagkuha og dinalian o EPT para sa dali nga kargamento.
Q3: Unsa gyud ang pahayag sa garantiya?
EPT EPT warrants all the products manufactured by EPT EPT to totally free from flaws in material and workmanship UnEPTnormal use of a period of time of twelve months or 36months soon after the day of the first obtain value if fix or alternative is not attainable of practical, EPT EPT guarantee addresses ONLY the solution itself.
Ang EPT dili manubag sa mga EPT sa trabaho, mga natukod nga EPT, o uban pang mga kapildihan.
Ang imong legal nga mga katungod sa garantiya pagatahuron
Only when the solution has been set up and used effectively as considered by EPT EPT,EPTEPT will not fix products ruined by improper use or defective installation.
This fall:What about EPT oversea provider ?
EPT will arrange oversea location up and coaching functions if client need .
Buyer ought to pay out for accommodation , tickets and income .
In the meantime EPT has branches in diverse locations like north The usa , SouthEPT Asia , Brazil etc , and so on .

