
EPG has established up a total set of top quality management program which is supplied with advanced inspection and test products. we have obtained the have confidence in of consumers throughout the world. We are looking ahead to developing successful enterprise associations with new clients around the globe in the foreseeable future.
S collection Helical Geared EPTT Mga Kinaiya
usa. Mga gimbuhaton:
- Higher performance: seventy five%-eighty%
- Higher EPTT: the helical EPTT and a worm EPTT blended with an integrated EPTT to improve the torque and performance.
- Higher precision: the EPTT is manufactured of high-high quality alloy metal forging, carbonitriding and hardening therapy, grinding process to make certain substantial precision and steady operating.
- Substantial interchangeability: very modular, serial layout, strong versaEPTTty and interchangeability.
duha. EPTT parametromga
| Ratio | 6.eight-288 |
| Pagsulod sa EPTT | .twelve-22KW |
| Torque sa output | 11-4530N.m |
| Katulin sa pagpagawas | five-206rpm |
| Pag-uuri sa pag-mount | Gitaod sa tiil, gitaod sa tiil nga may kasaligang shaft, gitaod sa output flange, gitaod sa hollow shaft, B5 flange nga gitaod sa hollow shaft, gitaod sa tiil nga may hollow shaft, B14 flange nga gitaod sa hollow shaft, gitaod sa tiil nga may splined hole, gitaod sa tiil nga may shrink disk, gitaod sa hollow shaft nga may anti-torque arm. |
| Enter Approach | Flange input(AM), shaft input(Ad), inline AC motor enter, or AQA servo motor |
| Pagbuhi sa Preno | EPT-handbook launch(lock in the brake launch position), EPT-manual release(autom-atic braking place) |
| Termistor | TF(Thermistor defense PTC thermisto) TH(Thermistor safety Bimetal swotch) |
| Mounting Situation | M1, M2, M3, M4, M5, M6 |
| Matang | S37-S97 |
| Pag-distribute sa output shaft. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, |
| Mga materyales sa EPTT | EPTT200 substantial-energy cast iron from R37,forty seven,fifty seven,67,seventy seven,87 |
| Materyal nga EPTT | EPTT250 Substantial energy cast iron from R97 107,137,147, 157,167,187 |
| Heat treatment method EPTT | pamaagi sa pagtambal sa carbonitriding ug hardening |
| Kaepektibo sa Usa ka Yugto | 75%-eighty% |
| Lubricant | VG220 |
| Security Course | IP55, F nga kurso |
Mahitungod Kanamo
ZheJiang EPTT Push Co.,Ltd,the predecessor was a state-owned military mould EPTTrprise, was estabEPTTd in 1965. EPTT EPTTizes in the comprehensive EPTT EPTT resolution for substantial-stop gear producing EPTT based on the intention of quotPlatform Merchandise, Application Layout and Professional Provider quot.
EPTT have a powerful specialized force with over 350 staff at existing, incXiHu (West Lake) Dis.Hu (West Lake) Dis. over 30 engineering experts, 30 quality inspectors, masking an spot of 80000 square meters and types of EPTT processing EPTTs and testing equipments. We have a very good basis for the sector application deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment and provider of large-stop pace EPTTs amp variators proudly owning to the provincial engineering EPTT study cEPTTr,the lab of EPTT pace EPTTs, and the foundation of present day R ampD.
Ang Among mga Kawani
EPTT Control
EPTT:Insist on EPTTrovement,Try for Excellence With the deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment of products producing indurstry,consumer never satirsfy with the current good quality of our goods,on the contrary,wEPTT the worth of high quality.
EPTT plan:to increase the overall stage in the discipline of EPTT EPTT
EPTT See:Continuous EPTTrovement , pursuit of excellence
EPTT Philosophy:EPTT EPTTs price
three. Incoming EPTT Management
To establish the AQL appropriate stage of incoming materials handle, to supply the materials for the EPTT inspection, sampling, immunity. On the acceptance of competent merchandise to warehousing, substXiHu (West Lake) Dis.Hu (West Lake) Dis.rd products to just take return, examine, rework, rework inspection liable for monitoring negative, to check the provider to consider corrective
measures to avoid recurrence.
4. Method EPTT Handle
The production site of the initial assessment, inspection and closing inspection, sampling according to the specifications of some projects, judging the quality alter craze
discovered abnormal phenomenon of production, and supervise the manufacturing department to enhance, eliminate the abnormal phenomenon or condition.
5. FQC(Ultimate QC)
Right after the production section will full the solution, stand in the customer’s situation on the completed item top quality verification, in get to guarantee the quality of
consumer anticipations and demands.
unom. OQC (Pagawas nga QC)
Soon after the product sample inspection to deterEPTT the certified, allowing storage, but when the concluded item from the warehouse prior to the official shipping and delivery of the products, there is a examine, this is called the cargo inspection.Check out content:In the warehouse storage and transfer position to validate, whilst confirming the supply of the
product is a solution inspection to deterEPTT the qualified items.
7. Sertipikasyon.
EPTT
Suplay

