{"id":1663,"date":"2020-11-16T11:45:17","date_gmt":"2020-11-16T11:45:17","guid":{"rendered":"https:\/\/cyclogearreducer.top\/in-kumamoto-japan\/"},"modified":"2020-11-16T11:45:17","modified_gmt":"2020-11-16T11:45:17","slug":"in-kumamoto-japan","status":"publish","type":"post","link":"https:\/\/cyclogearreducer.top\/sk\/in-kumamoto-japan\/","title":{"rendered":"v japonskom Kumamote"},"content":{"rendered":"<p><img decoding=\"async\" style=\"height:auto\" title=\" v japonskom Kumamote  \" src=\"https:\/\/img.hzpt.com\/uploads\/images\/mechanical\/HelicalGearbox.jpg\" alt=\" v japonskom Kumamote  \" \/><\/p>\n<p> Z\u00edskali sme si d\u00f4veru z\u00e1kazn\u00edkov na celom svete. Spolo\u010dnos\u0165 EPG zaviedla kompletn\u00fd s\u00fabor syst\u00e9mov riadenia kvality, ktor\u00e9 s\u00fa vybaven\u00e9 \u0161pi\u010dkov\u00fdm kontroln\u00fdm a testovac\u00edm vybaven\u00edm. Ka\u017ed\u00fd pr\u00edstup, ka\u017ed\u00e1 \u010das\u0165, ka\u017ed\u00e1 funkcia v spolo\u010dnosti EPG mus\u00ed by\u0165 dokon\u010den\u00e1 krok za krokom, d\u00f4kladne a opatrne, od v\u00fdberu materi\u00e1lu, cez prepracovanie a\u017e po v\u00fdrobn\u00e9 zariadenia, od tepelnej terapie dielov a\u017e po automatick\u00fa mont\u00e1\u017e, od riadenia kvality a\u017e po kontrolu a skr\u00edning tovaru a od n\u00e1kupu a\u017e po n\u00e1sledn\u00e9 pr\u00edjmov\u00e9 slu\u017eby.<\/p>\n<p><img decoding=\"async\" style=\"height:auto\" title=\" v japonskom Kumamote  \" src=\"https:\/\/img.hzpt.com\/uploads\/images\/mechanical\/SlewplanetaryGearbox.jpg\" alt=\" v japonskom Kumamote  \" \/><\/p>\n<p><img decoding=\"async\" style=\"height:auto\" title=\" v japonskom Kumamote  \" src=\"https:\/\/img.hzpt.com\/uploads\/images\/mechanical\/contact.jpg\" alt=\" v japonskom Kumamote  \" \/><\/p>","protected":false},"excerpt":{"rendered":"<p>we have received the believe in of consumers worldwide. EPG has established up a full set of good quality administration method which is provided with superior inspection and test gear. Each and every approach, each part, each function in EPG is demanded to be completed a single phase subsequent one more, meticulously and cautiously, from [&hellip;]<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-1663","post","type-post","status-publish","format-standard","hentry","category-product-catalog"],"_links":{"self":[{"href":"https:\/\/cyclogearreducer.top\/sk\/wp-json\/wp\/v2\/posts\/1663","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cyclogearreducer.top\/sk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cyclogearreducer.top\/sk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cyclogearreducer.top\/sk\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cyclogearreducer.top\/sk\/wp-json\/wp\/v2\/comments?post=1663"}],"version-history":[{"count":0,"href":"https:\/\/cyclogearreducer.top\/sk\/wp-json\/wp\/v2\/posts\/1663\/revisions"}],"wp:attachment":[{"href":"https:\/\/cyclogearreducer.top\/sk\/wp-json\/wp\/v2\/media?parent=1663"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cyclogearreducer.top\/sk\/wp-json\/wp\/v2\/categories?post=1663"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cyclogearreducer.top\/sk\/wp-json\/wp\/v2\/tags?post=1663"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}