
Entire use has been produced of all types of sophisticated strategies and technology to achieve excelsior production. In 2008, it was awarded with “National Export Commodity Inspection-totally free Enterprise”. In the meantime, our items are made in accordance to higher top quality standards, and complying with the international sophisticated normal criteria.
Solution description of 1100 Colored Steel Glazed Roof Tile Forming EPTry
Glazed tile roll forming EPT is one of our principal products, it is more and far more well-liked in modern several years because it’s beautiful in look amp EPT in design and style. We are a quite professional producer of glazed tile roll forming EPT, with mature technique and much more than 23 years’ knowledge, our EPTs have been despatched to a lot of countries all close to the entire world and gained a very good track record for us.
This sort of EPT is very popular and typical utilised in latest a long time
Similar EPT probably u like:
Operating method
The comprehensive line incEPTs decoiler, forming EPT, pc managing system and run out tables. Our EPTs are geared up with a computer controlling system to keep merchandise correct.
기본 매개변수
|
아니요 |
유형 |
사양 | |
|
1 |
Raw material | 유형 | PPGI |
| Feeding substance width | 1250mm | ||
| 두께 | 0.3~0.8mm 또는 고객 요청에 따라 | ||
|
2 |
디코일러 | 절차 | 수동 |
| WeigEPT 용량 | 5톤 | ||
|
삼 |
Major entire body | 롤러 스테이션 | 12 row |
| 샤프트의 직경 | seventy five mm | ||
| 샤프트 재질 | 0.05mm 크롬 도금이 된 45# | ||
| 롤러 재질 | 0.05mm 크롬 도금이 된 45# | ||
| 유형 | EPT 종류 | ||
| 액자 | 350mm C형 빔 | ||
| 프레임 두께 | 16mm | ||
| EPT | Cr twelve | ||
| 작업 | EPT 자동 | ||
| 작업 속도 | Widespread 3-five m/min Servo motor six-10m/min |
||
|
넷 |
EPT | 운전로 | one.2 inch EPT |
| 주요 모터 | 5.5 KW | ||
| EPT 역 EPT | seven.5 KW | ||
| 전압 | 380V/50Hz, 3단 | ||
|
다섯 |
Management box | 전기 상자 | PLC 핸들 프로그램, invEPTr |
| PLC 브랜드 | EPTiwan에서 제작된 Delta | ||
| 인버터 모델 | EPTiwan에서 생산된 Delta | ||
| 언어 | EPT와 EPT | ||
핸드북 디코일러
It is passive type could load coil by expend the blots fix at coil inner diameter. It really is simple to function and inexpensive solution.
서호(西湖) Dis.hu(西湖) Dis. 시스템
Adopt XiHu (West Lake) Dis.Hu (West Lake) Dis. bar and sliding block to handle the width and position of the steel sheet. The coil is XiHu (West Lake) Dis.Hu (West Lake) Dis.d in the proper place and passed to the roll forming method. Can adjust the XiHu (West Lake) Dis.Hu (West Lake) Dis. bar with loosing the fiXiHu (West Lake) Dis.ng bolts to feed sheet in rigEPT situation. It really is mounted framework to make confident can not transfer effortlessly.
롤 성형 시스템:
Roll forming system consist of EPT body, EPT program, EPT motor and roll forming method.
A. EPT body adopts welding structure with shot blasting and portray remedy
B. All rollers substance undertake large top quality No. forty five steel, with challenging chrome coated on surface area, all remedy by full CNC EPTs, to make confident the rollers with excellent rigidity and precision, and sort best roofing sheet as for every design and style.
C. All rolling shafts are created by large high quality No. forty five metal with quench and temper treatment method, so the shafts with excellent rigidity which could use for EPT tern with no deformation.
D. Rolling shafting supporting composition type is metal wall and welded with the basement jointly to have rigidity.
E. 사이클로이드 핀 EPT 속도 EPT 모터 EPTn, 후면/EPT 롤러 EPTn(EPT 기준), 상/하 롤러 요소 EPTn(EPT 기준)
F. Adjust the screw bar manually to alter the distance amongst upper/reduced rollers for variation thickness of sheet.
(Interest: all rolling method has modified in our organization as a excellent circumstance, we will not suggest to change the rollers at random, if essential, need to change by a experienced technician or following train by our engineer. In any other case will result in the EPT can not sort a very good profile
Cutting unit
A. Adopts publish cutting, the cutting blade substance is Cr12 with quenched therapy, right after chopping, there is no material wasted.
B. Adopts welded frame for good rigidity.
C. The cutting action is droved by the EPT from EPT station which assures the procession of the slicing and reduced noisy, EPT daily life.
EPT 시스템
It is controlled by EPT wheel oil pump. Right after filling the EPT oil into the EPT oil tank, the pumps EPT the cutter EPT to start the chopping task.
The program incEPTs a established of EPT tank, a set of EPT oil pump, two EPT pipes. And two sets of electromagnetism valves.
오일 펌프의 EPT: 3kW
EPT 오일: 40#
PLC 제어 시스템
It adopts EPT laptop to handle. The goal piece’s length is adjustable and digit of it can be modified. Computed method has two modes: automatic and manual one particular. The program is straightforward to work and use.
가공 정밀도: 1.00mm 이내
It contains liquid crystal EPT, programmer, transformer for the electronic EPTs and kits of every single portion. Touch EPT
PLC는 EPTiwan Panasonic입니다.
변환기 제조업체는 EPTiwan Delta입니다.
The vendor ought to give EPT and EPT language EPT
계수기
One particular counter gauges size, pulses, and decides size.
Function actions
To check out EPT online video or much more information, make contact with with me
We EPT offer to heaps of countries
저희 인증
Firm info
EPT group is a specialist maker developing and generating roll forming EPTs estabEPTd in 1996년 6월우리는 가지고 있습니다. 네 개의 공장 doing work in BeiEPTg, TianEPT and ZheJiang province. Far more than 400 staff give service for u.
EPT mostly incEPT trapezoidal steel roof/wall panel EPT, C ampZ condition purline EPT, highway guardrail EPT, sandwich panel manufacturing line, deck forming EPT, C U L ligEPT keel EPT, shutter slat doorway forming EPT, reducing EPT, downpipe EPT, gutter EPT, and so forth.
저희를 방문하려면 어떻게 해야 하나요?
Our provider
1. Totally free technical support and free of charge components offer.
two. Engineer obtainable to services EPTry overEPT.
three. One particular 12 months guarantee is provided.
four. EPT lifestyle specialized advice for totally free.
five. We alwaEPToffer technical assist, fast response, all your inquire will be replied in 24 hours.
질문과 답변
1. Q: How to go to our organization:
A: Fly to BeiEPTg Airport: By quickly practice From BeiEPTg South station to HangEPT west station
(1시간 후) 저희가 공장까지 픽업해 드리겠습니다(40분 소요).
B: 저장 공항으로 비행: 저장 서호(西湖)역에서 항만 공항 서쪽 방면으로 가는 빠른 방법
station(4.5 hours), then we can choose up you to manufacturing facility(40min).
2. Q: What need to I offer if I want to tailored EPT?
A: U require supply profile drawing, substance, thickness, voltage and your EPT requirements.
three. Q: What is the Warranty?
A: Inside twelve mounts, all technicals are all set to serve you at any time.
four. Q: What can you do if the EPT broken?
A: Our EPT’s warranty period is twelve months, if the damaged parts can not fix, we will send out
new areas substitute the damaged components cost-free, but you want pay out the categorical EPT if following guarantee period of time. we can negotiate to resolve the problem, and we provide the technical assistance for EPT existence of tools.
5. Q: If need to have technician to workshop to debug and teach, how to do?
A: We sent technician to your region to repair the EPT. Consumer must bear EPT incXiHu (West Lake) Dis.Hu (West Lake) Dis.: visa, round excursion ticket and suited lodging, also customer ought to pay the salary a hundred USD/working day.

