
Our merchandise are utilized in several fields. With thorough requirments, we can also create your unique created item. We have exported our items to Korea, Turkey, Bulgaria, Romania, Russia, Italy, Norway, the United states, Canada, and many others. Product description of Round arc glazed tile roof sheet roll forming EPT
Glazed tile roll forming EPT is one particular of our primary goods, it is more and much more popular in latest a long time simply because it really is stunning in look amp EPT in style. We are a very specialist producer of glazed tile roll forming EPT, with experienced approach and much more than 23 years’ knowledge, our EPTs have been despatched to several nations around the world all about the world and gained a good reputation for us.
This kind of EPT is quite well-liked and common employed in latest many years
Related EPT maybe u like:
Operating approach
The complete line incEPTs decoiler, forming EPT, personal computer managing program and run out tables. Our EPTs are outfitted with a personal computer managing technique to preserve goods correct.
주요 매개변수
|
아니요 |
종류 |
사양 | |
|
1 |
원본 콘텐츠 | 종류 | PPGI |
| 콘텐츠 너비 공급 | 1250mm | ||
| 두께 | .3-.eight mm or as customer’s request | ||
|
2 |
디코일러 | 절차 | 수동 |
| WeigEPT 용량 | 5톤 | ||
|
3 |
Principal physique | 롤러 스테이션 | 12줄 |
| 샤프트의 직경 | 75mm | ||
| 샤프트 재질 | 0.05mm 크롬 도금이 된 45# | ||
| 롤러 물질 | 0.05mm 크롬 도금이 된 45# | ||
| 다양성 | EPT 품종 | ||
| 액자 | 350mm C형 빔 | ||
| 본체 두께 | 16mm | ||
| EPT | Cr 12 | ||
| 절차 | EPT 컴퓨터화 | ||
| Functioning speed | Widespread three-five m/min 서보 모터 6-10m/min |
||
|
4 |
EPT | 운전로 | 1.2 inch EPT |
| 주 모터 | 5.5KW | ||
| EPT 역 EPT | 7.5KW | ||
| 전압 | 380V/50Hz, 3주기 | ||
|
다섯 |
관리 상자 | 전기 상자 | PLC control method, invEPTr |
| PLC 모델 | EPTiwan에서 제작된 Delta | ||
| 인버터 모델 | EPTiwan에서 생산된 Delta | ||
| 언어 | EPT와 EPT | ||
수동식 디코일러
It is passive sort could load coil by expend the blots repair at coil internal diameter. It really is straightforward to function and affordable resolution.
서호(西湖) Dis.hu(西湖) Dis. 가젯
Undertake XiHu (West Lake) Dis.Hu (West Lake) Dis. bar and sliding block to handle the width and situation of the metal sheet. The coil is XiHu (West Lake) Dis.Hu (West Lake) Dis.d in the proper placement and handed to the roll forming technique. Can alter the XiHu (West Lake) Dis.Hu (West Lake) Dis. bar with loosing the fiXiHu (West Lake) Dis.ng bolts to feed sheet in rigEPT position. It’s set framework to make confident can not move easily.
롤 성형 프로그램:
Roll forming technique consist of EPT body, EPT system, EPT motor and roll forming system.
A. EPT 본체는 용접 구조에 쇼트 블라스팅 및 도장 처리 방식을 적용했습니다.
B. All rollers content adopt high good quality No. forty five metal, with difficult chrome coated on surface, all therapy by complete CNC EPTs, to make sure the rollers with excellent rigidity and precision, and type excellent roofing sheet as per style.
C. All rolling shafts are manufactured by large high quality No. forty five steel with quench and temper treatment method, so the shafts with great rigidity which could use for EPT tern with no deformation.
D. Rolling shafting supporting composition kind is steel wall and welded with the basement together to have rigidity.
E. Cycloidal pin EPT velocity EPT motor EPTn, the back/EPT roller EPTn by EPT, element of upper/reduce rollers EPTn by EPT
F. Modify the screw bar manually to modify the length amongst higher/lower rollers for big difference thickness of sheet.
(Attention: all rolling technique has modified in our firm as a perfect circumstance, we don’t advise to alter the rollers at random, if needed, ought to alter by a skilled technician or after train by our engineer. Or else will trigger the EPT can not kind a excellent profile
슬라이싱 시스템
A. Adopts put up cutting, the slicing blade content is Cr12 with quenched treatment method, following reducing, there is no content squandered.
B. Adopts welded body for very good rigidity.
C. The cutting action is droved by the EPT from EPT station which assures the procession of the slicing and minimal noisy, EPT life.
EPT 기법
It is controlled by EPT wheel oil pump. Following filling the EPT oil into the EPT oil tank, the pumps EPT the cutter EPT to get started the slicing task.
The program incEPTs a established of EPT tank, a established of EPT oil pump, two EPT pipes. And two sets of electromagnetism valves.
오일 펌프의 EPT: 3kW
EPT 오일: 40#
PLC 제어 시스템
It adopts EPT pc to manage. The focus on piece’s duration is adjustable and digit of it can be modified. Computed method has two modes: automated and manual a single. The system is straightforward to run and use.
가공 정밀도: 1.00mm 단위
It is made up of liquid crystal EPT, programmer, transformer for the digital EPTs and kits of each part. Touch EPT
PLC는 EPTiwan Panasonic입니다.
변환기 브랜드는 EPTiwan Delta입니다.
판매자는 EPT와 EPT 언어 EPT를 제공해야 합니다.
계수기
One particular counter gauges duration, pulses, and decides length.
Perform steps
To check EPT online video or far more particulars, get in touch with with me
We EPT sell to lots of international locations
저희 인증
회사 정보
EPT group is a professional producer designing and making roll forming EPTs estabEPTd in 1996년 6월우리는 가지고 있습니다. 4개의 공장 doing work in BeiEPTg, TianEPT and ZheJiang province. More than 400 employees provide provider for u.
EPT primarily incEPT trapezoidal metal roof/wall panel EPT, C ampZ form purline EPT, freeway guardrail EPT, sandwich panel manufacturing line, deck forming EPT, C U L ligEPT keel EPT, shutter slat door forming EPT, slicing EPT, downpipe EPT, gutter EPT, and so forth.
저희에게 오시는 방법은 무엇인가요?
저희 서비스
1. Free of charge complex support and totally free add-ons source.
two. Engineer offered to services EPTry overEPT.
3. One particular yr guarantee is presented.
4. EPT lifestyle complex advice for totally free.
5. We alwaEPToffer technological help, rapid reaction, all your inquire will be replied in 24 hours.
Concern amp Answer
one. Q: How to visit our organization:
A: Fly to BeiEPTg Airport: By quickly prepare From BeiEPTg South station to HangEPT west station
(1hour), then we can decide up you to factory(40min).
B: Fly to ZheJiang Airport: By rapidly train From ZheJiang XiHu (West Lake) Dis.hu (West Lake) Dis.ao station to HangEPT west
station(four.5 several hours), then we can choose up you to manufacturing unit(40min).
two. Q: What ought to I offer if I want to customized EPT?
A: U require supply profile drawing, material, thickness, voltage and your EPT requirements.
3. 질문: 보증 기간은 어떻게 되나요?
A: Within 12 mounts, all technicals are prepared to serve you at any time.
4. 질문: EPT가 손상된 경우 어떻게 해야 하나요?
A: Our EPT’s guarantee interval is 12 months, if the broken components can not fix, we will send out
new elements change the broken components totally free, but you require pay out the convey EPT if after guarantee time period. we can negotiate to resolve the problem, and we offer the complex assist for EPT lifestyle of tools.
5. 질문: 디버깅 및 교육을 위해 기술자가 작업장에 방문해야 하는 경우 어떻게 해야 합니까?
A: We sent technician to your country to repair the EPT. Customer ought to bear EPT incXiHu (West Lake) Dis.Hu (West Lake) Dis.: visa, round excursion ticket and appropriate accommodation, also customer need to shell out the salary 100 USD/day.

