
EPG is a expert producer and exporter that is concerned with the design and style, advancement and production. “We are often serving our buyers with our best products.” We are aiming to meet up with the calls for of the consumers around the planet.. Merchandise description of Glazed Steel Roof Sheet Roll Forming EPT
Glazed tile roll forming EPT is one particular of our principal products, it is a lot more and much more popular in recent years because it really is lovely in appearance amp EPT in design. We are a very expert producer of glazed tile roll forming EPT, with experienced method and more than 23 years’ experience, our EPTs have been despatched to several nations around the world all about the world and acquired a excellent reputation for us.
This kind of EPT is quite well-known and widespread utilized in latest years
비슷한 EPT를 원하시면 다음을 참고하세요:
Working method
The total line incEPTs decoiler, forming EPT, computer managing system and run out tables. Our EPTs are equipped with a personal computer controlling technique to maintain goods correct.
기본 매개변수
|
아니요 |
종류 |
사양 | |
|
1 |
Uncooked substance | 종류 | PPGI |
| 공급 재료 너비 | 914/1000/1200/1220/1250 mm | ||
| 두께 | 0.3~0.8mm 또는 고객 요청에 따라 | ||
|
둘 |
디코일러 | 작업 | 가이드 |
| WeigEPT 용량 | 5톤 | ||
|
3 |
Principal human body | 롤러 스테이션 | 13번째 줄 |
| 샤프트의 직경 | 75mm | ||
| Shaft materials | 0.05mm 크롬 도금된 45# | ||
| 롤러 콘텐츠 | 0.05mm 크롬 도금이 된 45# | ||
| 다양성 | EPT 유형 | ||
| 액자 | 350mm C형 빔 | ||
| 본체 두께 | 16mm | ||
| EPT | Cr twelve | ||
| 절차 | EPT 컴퓨터화 | ||
| 작동 속도 | Widespread 3-5 m/min and servo motor six-10m/min | ||
|
4 |
EPT | 운전로 | one.2 inch EPT |
| 주 모터 | five.5 KW | ||
| EPT 역 EPT | seven.5 KW | ||
| 전압 | 380V/50Hz, 3상 | ||
|
다섯 |
Management box | 전기 상자 | PLC control method, invEPTr |
| PLC 제조업체 | Delta created in EPTiwan | ||
| 인버터 모델 | Delta created in EPTiwan | ||
| 언어 | EPT와 EPT | ||
가이드 디코일러
It is passive sort could load coil by expend the blots resolve at coil inner diameter. It is effortless to work and inexpensive remedy.
서호(西湖) Dis.hu (서호) Dis. 단위
Undertake XiHu (West Lake) Dis.Hu (West Lake) Dis. bar and sliding block to control the width and placement of the steel sheet. The coil is XiHu (West Lake) Dis.Hu (West Lake) Dis.d in the correct position and handed to the roll forming program. Can change the XiHu (West Lake) Dis.Hu (West Lake) Dis. bar with loosing the fiXiHu (West Lake) Dis.ng bolts to feed sheet in rigEPT situation. It is set composition to make positive can not shift very easily.
롤 성형 시스템:
Roll forming program consist of EPT body, EPT system, EPT motor and roll forming program.
A. EPT body adopts welding framework with shot blasting and portray treatment
B. All rollers content undertake high quality No. 45 metal, with hard chrome coated on surface area, all therapy by complete CNC EPTs, to make positive the rollers with excellent rigidity and precision, and type perfect roofing sheet as for each style.
C. All rolling shafts are made by higher good quality No. forty five steel with quench and mood therapy, so the shafts with great rigidity which could use for EPT tern with out deformation.
D. Rolling shafting supporting framework kind is metal wall and welded with the basement together to have rigidity.
E. Cycloidal pin EPT speed EPT motor EPTn, the again/EPT roller EPTn by EPT, part of higher/lower rollers EPTn by EPT
F. Adjust the screw bar manually to adjust the distance in between upper/decrease rollers for distinction thickness of sheet.
(Consideration: all rolling program has adjusted in our business as a best scenario, we never suggest to adjust the rollers at random, if essential, ought to adjust by a skilled technician or after prepare by our engineer. Or else will result in the EPT can not sort a excellent profile
슬라이싱 기기
A. Adopts put up slicing, the chopping blade materials is Cr12 with quenched treatment, following cutting, there is no material wasted.
B. Adopts welded body for very good rigidity.
C. The slicing motion is droved by the EPT from EPT station which guarantees the procession of the slicing and reduced noisy, EPT life.
EPT 시스템
It is controlled by EPT wheel oil pump. After filling the EPT oil into the EPT oil tank, the pumps EPT the cutter EPT to begin the slicing occupation.
The program incEPTs a set of EPT tank, a established of EPT oil pump, two EPT pipes. And two sets of electromagnetism valves.
오일 펌프의 EPT: 3kW
EPT 오일: forty#
PLC management program
It adopts EPT personal computer to management. The concentrate on piece’s length is adjustable and digit of it can be modified. Computed mode has two modes: computerized and handbook a single. The system is effortless to operate and use.
가공 정밀도: 1.00mm 이내
It includes liquid crystal EPT, programmer, transformer for the digital EPTs and kits of every single component. Touch EPT
PLC는 EPTiwan Panasonic입니다.
변환기 브랜드는 EPTiwan Delta입니다.
The seller should give EPT and EPT language EPT
계수기
1 counter gauges duration, pulses, and decides length.
Perform steps
To examine EPT online video or far more specifics, contact with me
We EPT offer to lots of countries
저희 인증
사업 상세 정보
EPT team is a expert company developing and producing roll forming EPTs estabEPTd in 1996년 6월우리는 가지고 있습니다. 4개의 공장 doing work in BeiEPTg, TianEPT and ZheJiang province. A lot more than four hundred staff provide service for u.
EPT primarily incEPT trapezoidal metal roof/wall panel EPT, C ampZ condition purline EPT, freeway guardrail EPT, sandwich panel creation line, deck forming EPT, C U L ligEPT keel EPT, shutter slat doorway forming EPT, cutting EPT, downpipe EPT, gutter EPT, and so on.
저희에게 오시는 방법은 무엇인가요?
Our provider
1. Cost-free technological assist and free add-ons supply.
two. Engineer available to support EPTry overEPT.
three. A single 12 months warranty is supplied.
four. EPT daily life technological guidance for totally free.
five. We alwaEPToffer specialized assistance, swift reaction, all your inquire will be replied in 24 several hours.
Query amp Solution
one. Q: How to visit our company:
A: Fly to BeiEPTg Airport: By quickly train From BeiEPTg South station to HangEPT west station
(1hour), then we can decide up you to factory(40min).
B: 저장 공항으로 비행 후, 저장 서호(西湖)역에서 고속 열차를 타고 항만 EPT 서쪽역까지 이동
station(four.five hours), then we can decide up you to factory(40min).
2. Q: What must I give if I want to personalized EPT?
A: U need to have supply profile drawing, materials, thickness, voltage and your EPT demands.
3. 질문: 보증 내용은 무엇인가요?
A: In 12 mounts, all technicals are ready to provide you at any time.
four. Q: What can you do if the EPT broken?
A: Our EPT’s warranty interval is twelve months, if the broken parts are unable to mend, we will deliver
new areas exchange the damaged areas free of charge, but you require spend the specific EPT if right after warranty period. we can negotiate to solve the dilemma, and we offer the technological help for EPT existence of equipment.
5. Q: If need to have technician to workshop to debug and train, how to do?
A: We sent technician to your country to correct the EPT. Buyer need to bear EPT incXiHu (West Lake) Dis.Hu (West Lake) Dis.: visa, round journey ticket and suitable accommodation, also consumer need to shell out the salary one hundred USD/working day.

