
We examine each and every piece of bearing by ourselves before supply. Superior thermo treatment tools, this kind of as network heat treatment oven, multi-use thermo therapy oven, and many others. Good quality and credit history are the bases that make a company alive. EPT EPT KneaEPT sol internal mixer lparX lparS rpar-75LX30 rpar
X lparS rparN-3L 10L 20L 35L 55L 75L 110L as consumers needs to produce
one period MiXiHu (West Lake) Dis.ng chamber colon
It is composed of a quotW quot shape entire body and the surfacing at the base is welded from the extremely put on-resisting difficult alloy commato achieve the put on resistance commatwo side boards created of high high quality metal plates by indicates of extrusion forming and welding comma which are jacked to get the stream of cooling water or steam interval It is plated with tough chrome on its inside walls time period
2 periodThermal Resistance colon
There is a plug-in thermal resistance in middle EPT of the bottom of the chamber to be linked to EPT program to inspect and exhibit the temperate time period
3 periodRotor colon
It is made to the hollow blades of Banbury kind period of time The hollows are connected with aXiHu (West Lake) Dis.al gap of rotor shaft used as cooling or heating passage time period The leading edges of blades and the finish faces of ~ rotor shaft are surface area welded with cobalt-foundation tough alloy and grinding comma then plating with challenging chrome and poEPTng period of time
We use the unique production of WaEPTdian bearings interval lparTop class products in EPT industry rpar
4 periodPressing Technique
The higher ram weigEPT is in hump layout semi the weigEPT retains in shut make contact with with the blade EPT of the rotor semi there is no miXiHu (West Lake) Dis.ng EPT space in the miXiHu (West Lake) Dis.ng chamber comma so as to improve the miXiHu (West Lake) Dis.ng rubber property period
The functioning surface of the upper ram is taken care of with chromium plating semi the interior chamber is mounted with the heating and cooling channel semi and can be cooled or heated according to the approach demands semi it is also outfitted with the anti-dust include semi based mostly on the mixture between the anti-dust protect and the dust-absorbing pipeline over the miXiHu (West Lake) Dis.ngchamber comma the dust explosion can be diminished appropriately time period
5 periodCooling solheating technique colon
A typical piping technique is adopted for possibly cooling or heating material in miXiHu (West Lake) Dis.ng operation period of time By way of the method cooling drinking water or steam is fed in three waEPTto the cavities of the rotors blades comma the miXiHu (West Lake) Dis.ng chamber and the leading ram period
6 periodTilting mechanism colon
It is made up of a rotor with brake comma cycloidal EPT EPT comma TP type worm and worm EPT comma and so on period time period It is ready to actuate the miXiHu (West Lake) Dis.ng chamber tilting by a hundred and forty deg about the front rotors interval
7 periodDust sealing unit colon
At the joint among the best of the miXiHu (West Lake) Dis.ng chamber and the cantiEPTed arm of the EPT frame comma the dust sealing assemblies with curved slotted partings are utilized obXiHu (West Lake) Dis.Hu (West Lake) Dis. an outstanding and trustworthy sealing objective interval
The stop experience of the rotor is sealed by finish get in touch with sealing with nor oil-lubrication and is seals effectively and is put on-resistant and sturdy period of time
eight periodMain driving technique colon
The element is made up with principal motor comma EPT comma connecting EPTs period It realizes odd-speed rotation of the rotors with managing encounter a single other period of time
9 periodthe EPT colon
We use the hardened-EPT EPT which EPTized for roll-more than mixer comma it makes certain the abrasion resistance comma while keeps the EPT toughness time period
10 periodPneumatic handle program colon
Pneumatic manage system is managed by XG purchase period of time The bi-directional air cylinEPTmakes the ram up or down interval In situation the in excess of load occurs in the miXiHu (West Lake) Dis.ng chamber comma the prime ram can be raised automatically or manually if needed comma so as to safeguard motor from overload interval
11 periodElectric manage system colon
EPTorted PLC device and electrical manage parts which are all EPTed merchandise or EPTed EPT items are adopted in the electric powered management system as to raise control dependability period of time
Also apart from PLC handle comma the miXiHu (West Lake) Dis.ng chamber can be tilting by handbook commawhen EPT minimize commathe material can be dump out by handbook interval
| Тип | X lparS rparN-35L | X lparS rparN-55L | X lparS rparN-75L | X lparS rparN-110L |
| Цела запремина коморе за дистилацију (Западно језеро) | 75 | сто двадесет пет | 180 | 250 |
| Operating quantity of miXiHu (West Lake) Dis.ng chamber lparL rpar | 35 | педесет пет | седамдесет пет | сто десет |
| Брзина ротације ротора lparfront rpar lparr solmin rpar | 36 | 36 | 36 | 30 |
| Rotational velocity of the rotor lparrear rpar lparr solmin rpar | тридесет | 30 | 30 | 24 периода5 |
| Погонски мотор EPT lparKW rpar | 55 | 75 | 110 | 185 |
| Угао нагиба | сто десет степени | 110 степени | 110 степени | 110 степени |
| Measurement colon Length instances Width moments Top | 3150 пута 1900 пута 2880 | 3280 moments 2120 instances 3090 | 3250 instances 2120 occasions 3250 | 4075 moments 2712 moments 3580 |

