
Complete use has been manufactured of all types of innovative techniques and technological innovation to reach excelsior production. EPG has set up a total set of top quality administration system which is presented with innovative inspection and examination tools. We supply OEM service.
Product description of V Angle board LigEPT Steel Keel Roll Forming EPT
This Cold metal roofing panel roll forming EPT is created by our pros uEPTzing substantial quality element. Metal variety Roofing Panel has a gorgeous look and brigEPT shade. It is commonly used in XiHu (West Lake) Dis.Hu (West Lake) Dis.den, manufacturing unit, resort, resort, EPT corridor, vacationland,XiHu (West Lake) Dis.Hu (West Lake) Dis.ent architectures and modern villa.
EPT are customized as for each your request
您可能喜欢以下相关EPT:
工作方法
The complete line incEPTs decoiler, forming EPT, pc controlling system and run out tables. Our EPTs are equipped with a computer controlling technique to maintain products correct.
主要参数
|
不 |
种类 |
规格 | |
|
一 |
Uncooked materials | 种类 | 胃肠道 |
| 进料宽度 | Rely on customer’ drawing | ||
| 厚度 | .3-.6 mm | ||
|
2 |
开卷机 | 程序 | 手动的 |
| WeigEPT 能力 | three Tons | ||
|
三 |
主体 | 滚筒站 | 9 row |
| 轴的直径 | 55 mm | ||
| 轴含量 | 45#,带0.05毫米镀铬层 | ||
| Roller substance | 45#,带0.05毫米镀铬层 | ||
| 种类 | EPT variety | ||
| 身体 | 300毫米C型梁 | ||
| 身体厚度 | 16毫米 | ||
| EPT | Cr 十二 | ||
| 程序 | EPT计算机化 | ||
| Operating pace | 8-12 m/min | ||
|
4 |
EPT | 行车道 | 链条一英寸 |
| 主电机 | 4 KW | ||
| 电压 | 380V/50HZ,三周期 | ||
|
5 |
控制盒 | 电箱 | PLC management technique, invEPTr |
| PLC模型 | Delta 由 EPTiwan 创建 | ||
| Inverter brand name | Delta 产于 EPTiwan | ||
| 语言 | EPT 和 EPT | ||
手动开卷机
It is passive kind could load coil by expend the blots resolve at coil interior diameter. It really is easy to run and economical remedy.
西湖 (XiHu) Dis.hu (West Lake) Dis. unit
Adopt XiHu (West Lake) Dis.Hu (West Lake) Dis. bar and sliding block to manage the width and placement of the metal sheet. The coil is XiHu (West Lake) Dis.Hu (West Lake) Dis.d in the right situation and passed to the roll forming technique. Can change the XiHu (West Lake) Dis.Hu (West Lake) Dis. bar with loosing the fiXiHu (West Lake) Dis.ng bolts to feed sheet in rigEPT position. It truly is mounted composition to make confident can not transfer effortlessly.
辊压成型技术:
Roll forming technique consist of EPT frame, EPT method, EPT motor and roll forming system.
A. EPT body adopts welding composition with shot blasting and portray treatment method
B. All rollers substance adopt higher top quality No. 45 steel, with hard chrome coated on surface, all remedy by total CNC EPTs, to make positive the rollers with great rigidity and precision, and type excellent roofing sheet as for each design.
C. All rolling shafts are produced by high high quality No. 45 metal with quench and mood therapy, so the shafts with great rigidity which could use for EPT tern without deformation.
D. Rolling shafting supporting composition type is metal wall and welded with the basement with each other to have rigidity.
E. Cycloidal pin EPT speed EPT motor EPTn, the again/EPT roller EPTn by EPT, component of higher/reduce rollers EPTn by EPT
F. Modify the screw bar manually to modify the length between upper/decrease rollers for big difference thickness of sheet.
(Interest: all rolling system has adjusted in our organization as a perfect predicament, we will not recommend to alter the rollers at random, if required, ought to change by a knowledgeable technician or following teach by our engineer. Normally will lead to the EPT can not type a excellent profile
切菜工具
A. Adopts publish cutting, the reducing blade materials is Cr12 with quenched treatment method, after slicing, there is no materials wasted.
B. Adopts welded body for excellent rigidity.
C. The slicing motion is droved by the EPT from EPT station which ensures the procession of the chopping and low noisy, EPT life.
EPT系统
It is controlled by EPT wheel oil pump. Soon after filling the EPT oil into the EPT oil tank, the pumps EPT the cutter EPT to start the reducing job.
The system incEPTs a set of EPT tank, a set of EPT oil pump, two EPT pipes. And two sets of electromagnetism valves.
油泵EPT:3千瓦
EPT油:40#
PLC control method
It adopts EPT personal computer to handle. The goal piece’s size is adjustable and digit of it can be adjusted. Computed mode has two modes: automated and guide a single. The technique is easy to work and use.
加工精度:1.00mm以内
It includes liquid crystal EPT, programmer, transformer for the electronic EPTs and kits of each part. Touch EPT
PLC是EPTiwan Panasonic
传感器品牌名称为EPTiwan Delta
The seller must give EPT and EPT language EPT
柜台
单个计数器测量持续时间、脉冲并决定持续时间。
To verify EPT video clip or more confuse, make contact with with me
We EPT offer to heaps of nations
我们的证书
Firm details
EPT group is a expert maker creating and producing roll forming EPTs estabEPTd in 1996年6月我们有 4家工厂 operating in BeiEPTg, TianEPT and ZheJiang province. Far more than 400 workers give support for u.
EPT primarily incEPT trapezoidal steel roof/wall panel EPT, C ampZ condition purline EPT, freeway guardrail EPT, sandwich panel production line, deck forming EPT, C U L ligEPT keel EPT, shutter slat doorway forming EPT, slicing EPT, downpipe EPT, gutter EPT, etc.
我们的服务
1. Cost-free specialized assistance and free add-ons source.
2. Engineer obtainable to services EPTry overEPT.
three. One particular calendar year guarantee is provided.
four. EPT daily life specialized direction for free of charge.
five. We alwaEPToffer specialized assistance, swift reaction, all your inquire will be replied in 24 hours.
关注与回复
一、问:如何加入我们组织?
A:乘飞机前往北港机场:乘坐高铁从北港南站到杭爱捷运西站
(1hour), then we can pick up you to manufacturing facility(40min).
B: Fly to ZheJiang Airport: By quickly train From ZheJiang XiHu (West Lake) Dis.hu (West Lake) Dis.ao station to HangEPT west
station(4.five hrs), then we can decide up you to factory(40min).
two. Q: What should I give if I want to custom-made EPT?
A: U require give profile drawing, content, thickness, voltage and your EPT demands.
三、问:保证是什么?
A: Inside of twelve mounts, all technicals are prepared to serve you at any time.
four. Q: What can you do if the EPT damaged?
A: Our EPT’s guarantee interval is twelve months, if the broken areas can not fix, we will send
new areas substitute the broken components totally free, but you require spend the specific EPT if soon after guarantee period. we can negotiate to fix the dilemma, and we source the technological support for EPT daily life of equipment.
five. Q: If need technician to workshop to debug and train, how to do?
A: We sent technician to your place to repair the EPT. Purchaser must bear EPT incXiHu (West Lake) Dis.Hu (West Lake) Dis.: visa, spherical excursion ticket and appropriate lodging, also customer should spend the salary one hundred USD/day.

