
we provide chromed bar and tubes for hydualic and pheumatic cylinders. guarantees the security and regularity of the crucial operate of factors. Excellent attention has been paid out on environmental safety and energy conserving.
plastic corrugated pipe producing EPTTry
1.Plastic corrugated pipe (PE, PP,PVC,PA) commonly utilised in the wire link of EPTT instrument EPTTry and electrical box control cupboard, the solution is beautiful, ligEPTT and durable, widely used in automotive wire harness, digital, mechanical wire harness and other fields.
two.The corrugated pipe extrusion line incEPTTs a EPTT feeEPTTand a drying hopper, a SJ65 single-screw extruder, a die, forming modules, a forming EPTT and a winder.
2.Features:
one. Touch EPTT manage, simple to run
two.four-32mm without having equipment, catheter adapter
3.Stepper transfer, belt traction, large pace and security
4. Affordable
| NO. | 确认 | EPTT |
| 1 | EPTT Feeder | 1 |
| 二 | SJ45/thirty one screw extruEPTTwith vehicle EPTT loader | 一 |
| 三 | Die head | 八 |
| 4 | modules | 8 |
| 5 | Corrugater with mildew | 二 |
| 六 | Cutter | 一 |
| 七 | WinEPTTwith meter counting device | 1 |
Specification of EPTTPE Corrugated Pipe EPTT
Specification of the SJ六十五/33 挤出机
Performance functions:
Screw: Massive output amp L/D ratio. with minimal temperature plastication idea.
Barrel: barrel is manufactured of EPTT steel alloy, and is equipped with EPTT thermal foil with air cooling system.
EPTT: EPTTs are made of metal alloy with warmth remedy and are completed with surface area precision grinding. By utilizing oil EPTT cooling method, it minimizes sounds when operating unEPTThigh RPM and enhances the existence span of EPTTs.
InvEPTTr:ABB Temperature desk:Omron Contactor:Simens
| 产品 | GSJ-sixty five/33 |
| Extrude central top | 1100毫米 |
| Large performance screw | |
| 直径 | 65mm |
| L/D | 33:1 |
| EPTT | 38CrMoAlA |
| Floor Treatment method | Nitrided and PoEPTTd |
| Barrel | |
| EPTT | 38CrMoAlA |
| Inner Floor remedy | Nitrided, floor |
| Heating method | By ceramic |
| Heating management zones | zones |
| Heating EPTT | 柯威 |
| 冷却方法 | By blower fan |
| Cooling zones | 4zones |
| Cooling EPTT | .2KW/zone |
| EPTT | |
| EPTT of the home | QT200 |
| Equipment type | Helical EPTTs |
| EPTT of the EPTT | 20CrMnTi |
| Warmth therapy of the EPTT area | 淬火 |
| EPTT of the axes bearings | 40Cr EPTTorted high top quality bearing |
| Major EPTT | 22KW |
二。Mold die with modules
-
- mildew stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd:Interior Dia : 1.5 quot two quot
2.2Heater Die adopt casting EPTT heater, mica heater for mouth die.
2.3Calibration Device :The substance of sizing device is large-high quality sporting resistance copper
two.4 Mould block: AL
two.5 All the molds inner runner are chrome plated and great mould steel.
two.six material:40Cr and nitrided
two.7 modules:五十 pairs
3. Corrugated style forming EPTT a single established
3.1Structure Horizontal
3.2Corrugators up/down shifting motor 2.2KW
three.3XiHu (West Lake) Dis.hu (West Lake) Dis. keep track of The substance is 40Cr
three.4Block seat EPTT is 40Cr, nitrided
3.5Back/EPTT Keep track of
3.6EPTT program Oil pump: one.1KW
three.7Corrugators motor AC motor two.2KW x one set
3.8Corrugators EPTT box Helical EPTTs
three.9Corrugators cooling Block is cooled by air, .25KW x5set cooling fan
四、 haul off EPTT and shrink pipe products 一 set
5. Cutter
3.EPTT photos:
You just inform me what EPTT you want,let us do the relaxation operate:
one. Design and manufacture suitble EPTT for you.
two. Just before delivery, we will test the EPTT till you are fully happy. (You can occur to our manufacturing unit to inspect the running generation line.)
three. Shipping.
4. We will give following-income services:
(one) Discipline installation and commissioning
(2) Discipline education your personnel (three) Subject maintenance and fix support
(four) Free EPTT Elements
(5) Movie/On-line complex support.
Evaluations by buyers
Cooperation Brand names
常问问题:
1.Are you company or buying and selling firm?
We are maker.
two.Why pick us?
We have twenty several years expertise for making EPTT.We can arrange for you to pay a visit to our local customer’s factory.
three.Shipping and delivery time: twenty~30 times.
4.Payment conditions:
30% of whole volume ought to be paid out by T/T as down payment, the balance (70% of whole volume) need to be paid out before delivery by T/T or irrevocable L/C(at sight).
five.Guarantee: 1 yr.
Feel cost-free speak to us at any time and most welcome to visit our factory!

