
EPG was awarded with “well-known product of Zhejiang Province” and “famous brand name of Zhejiang Province”. we have received the have confidence in of buyers around the world. The solution effectively displays environmental defense and vitality conserving.
K 系列 PXiHu(西湖)Dis.Hu(西湖)Dis.lel 轴-螺旋齿轮 EPTT 品质
一、功能:
- Substantial efficiency: ninety two%-93%
- Vertical output, compact composition, hard tooth floor , huge output torque, reduced sound and EPTT service existence.
- Large precision: the EPTT is created of higher-top quality alloy steel forging, carbonitriding and hardening treatment, grinding method to ensure higher precision and steady running.
- Substantial interchangeability: highly modular, serial design and style, strong versaEPTTty and interchangeability.
2. EPTT 参数
| 比率 | 5.36-197.37 |
| 输入EPTT | 12-200千瓦 |
| 输出扭矩 | 10-62800牛·米 |
| 输出速度 | 7-415转/分 |
| 安装排序 | Foot mounted, foot mounted with solid shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
| Enter Strategy | Flange input(AM), shaft enter(Advertisement), inline AC motor input, or AQA servo motor |
| Brake Launch | EPT-handbook release(lock in the brake release placement), EPT-handbook release(autom-atic braking placement) |
| 热敏电阻 | TF(热敏电阻安全PTC热敏电阻) TH(热敏电阻安全双金属开关) |
| 安装位置 | M1、M2、M3、M4、M5、M6 |
| 类型 | K37-K157 |
| 输出轴 | 25毫米、30毫米、35毫米、40毫米、50毫米、60毫米、70毫米、90毫米、110毫米、120毫米 |
| EPTT物质 | EPTT200 higher-power forged iron from R37,forty seven,57,sixty seven,seventy seven,87 |
| EPTT材料 | EPTT250 Higher power forged iron from R97 107,137,147, 157,167,187 |
| Heat remedy EPTT | 碳氮共渗和硬化处理 |
| Solitary Stage Efficiency | up to ninety six% |
| 润滑剂 | VG220 |
| Safety Class | IP55,F 课程 |
EPTT Generate
ZheJiang EPTT Generate Co.,Ltd,the predecessor was a point out-owned armed forces mould EPTTrprise, was estabEPTTd in 1965. EPTT EPTTizes in the full EPTT EPTT resolution for higher-stop tools production EPTT based mostly on the purpose of quotPlatform Product, Application Style and Skilled Services quot.
EPTT have a robust specialized force with over 350 personnel at present, incXiHu (West Lake) Dis.Hu (West Lake) Dis. above thirty engineering experts, 30 good quality inspectors, masking an spot of 80000 sq. meters and types of EPTT processing EPTTs and testing equipments. We have a great foundation for the industry application deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment and service of substantial-end speed EPTTs amp variators proudly owning to the provincial engineering EPTT study cEPTTr,the lab of EPTT speed EPTTs, and the base of modern day R ampD.
我们的船员
EPTT 控制
EPTT:Insist on EPTTrovement,Attempt for Excellence With the deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment of tools production indurstry,buyer never ever satirsfy with the existing top quality of our items,on the contrary,wEPTT the benefit of top quality.
EPTT coverage:to increase the total stage in the discipline of EPTT EPTT
EPTT Look at:Constant EPTTrovement , pursuit of excellence
EPTT Philosophy:EPTT EPTTs price
3. Incoming EPTT Management
To build the AQL suitable level of incoming content management, to provide the content for the EPTT inspection, sampling, immunity. On the acceptance of certified goods to warehousing, substXiHu (West Lake) Dis.Hu (West Lake) Dis.rd merchandise to just take return, check, rework, rework inspection accountable for monitoring poor, to check the provider to just take corrective
measures to prevent recurrence.
4. Procedure EPTT Management
The producing site of the first evaluation, inspection and last inspection, sampling according to the requirements of some initiatives, judging the top quality change development
located abnormal phenomenon of manufacturing, and supervise the manufacturing division to increase, remove the irregular phenomenon or state.
5. 最终质量控制 (FQC)
Following the production office will complete the product, stand in the customer’s position on the completed item high quality verification, in purchase to guarantee the high quality of
customer expectations and needs.
六、出货质量控制(OQC)
After the product sample inspection to deterEPTT the experienced, enabling storage, but when the finished product from the warehouse ahead of the formal shipping and delivery of the items, there is a verify, this is known as the cargo inspection.Check out content material:In the warehouse storage and transfer position to confirm, although confirming the supply of the
product is a item inspection to deterEPTT the competent items.
七、认证。
我们所有产品均获得 ISO、CE 和 UL 认证。
EPTT
送货

