
Every process, each area, each operate in EPG is demanded to be carried out one particular stage pursuing an additional, cautiously and cautiously, from materials selection, reformation to manufacturing add-ons, from parts warmth treatment method to automated assembly, from top quality handle to merchandise inspection and testing and from buy dealing to right after sales services. We will offer greatest providers and higher high quality goods with all sincerity. We offer you OEM support. Description of 2571 hot market 836 Corrugated Roof Sheet Roll Forming EPT for Guyana
The full corrugated roofing sheet generating EPT line incEPTs de-coiler, main EPT, laptop controlling system and operate out tables. Our EPTs are outfitted with a personal computer managing system. We just system the pieces and size we need to have in the laptop and the wave panel EPT creates it immediately. The EPTs are effortless to operate and working steady.
Similar EPT maybe u like:
Functioning procedure
The complete line incEPTs decoiler, forming EPT, laptop managing technique and run out tables. Our EPTs are equipped with a personal computer managing method to preserve merchandise correct.
Principal parameters
|
NEIN |
Sortieren |
Spezifikation | |
|
1 |
Ungekochtes Material | Typ | PPGI |
| Fütterungsbreite | 1250 mm | ||
| Dicke | .3-.8 mm | ||
|
zwei |
Abwickler | Betrieb | Führung |
| WeigEPT-Kapazität | fünf Tonnen | ||
|
3 |
Kräftige Statur | Rollenstation | fünfzehnte Reihe |
| Durchmesser der Welle | fünfundsiebzig mm | ||
| Schaftmaterial | 45# mit 0,05 mm Chrom | ||
| Walzeninhalt | 45# mit 0,05 mm Chrom | ||
| Art | EPT-Sortierung | ||
| Körper | 300-mm-C-Träger | ||
| Körperdicke | sechzehn mm | ||
| EPT | Cr zwölf | ||
| Verfahren | EPT automatisch | ||
| Arbeitstempo | eight-twelve m/min | ||
|
4 |
EPT | Fahrstraße | Kette ein Zoll |
| Primärmotor | 5,5 kW | ||
| Stromspannung | 380 V/50 Hz, drei Perioden | ||
|
fünf |
Kontrollkästchen | Verteilerkasten | PLC manage program, invEPTr |
| PLC-Markenname | Delta hergestellt in Osttiwan | ||
| Wechselrichtermodell | Delta wurde in EPTiwan gegründet | ||
| Sprache | EPT und EPT | ||
Handbuch für Abwickler
It is passive sort could load coil by expend the blots repair at coil interior diameter. It really is simple to work and inexpensive resolution.
XiHu (Westsee) Dis.hu (Westsee) Dis. Gadget
Undertake XiHu (West Lake) Dis.Hu (West Lake) Dis. bar and sliding block to control the width and situation of the steel sheet. The coil is XiHu (West Lake) Dis.Hu (West Lake) Dis.d in the appropriate placement and passed to the roll forming method. Can adjust the XiHu (West Lake) Dis.Hu (West Lake) Dis. bar with loosing the fiXiHu (West Lake) Dis.ng bolts to feed sheet in rigEPT position. It is mounted framework to make positive can not move simply.
Walzformprogramm:
Roll forming method consist of EPT frame, EPT technique, EPT motor and roll forming technique.
A. EPT frame adopts welding framework with shot blasting and portray treatment
B. All rollers materials adopt higher high quality No. forty five metal, with hard chrome coated on floor, all treatment method by entire CNC EPTs, to make confident the rollers with very good rigidity and precision, and form excellent roofing sheet as for every style.
C. All rolling shafts are created by large quality No. forty five metal with quench and mood treatment, so the shafts with great rigidity which could use for EPT tern without deformation.
D. Die Tragkonstruktion der Rollwelle besteht aus einer Stahlwand, die mit dem Fundament verschweißt ist, um Stabilität zu gewährleisten.
E. Cycloidal pin EPT velocity EPT motor EPTn, the again/EPT roller EPTn by EPT, part of upper/reduce rollers EPTn by EPT
F. Change the screw bar manually to change the distance between upper/decrease rollers for difference thickness of sheet.
(Consideration: all rolling system has adjusted in our business as a excellent circumstance, we do not propose to alter the rollers at random, if required, must modify by a skilled technician or soon after teach by our engineer. Otherwise will result in the EPT can not sort a very good profile
Cutting gadget
A. Adopts post chopping, the reducing blade substance is Cr12 with quenched remedy, after slicing, there is no material squandered.
B. Verwendet eine geschweißte Karosserie für eine gute Steifigkeit.
C. The reducing action is droved by the EPT from EPT station which ensures the procession of the slicing and minimal noisy, EPT life.
EPT-Programm
It is managed by EPT wheel oil pump. Following filling the EPT oil into the EPT oil tank, the pumps EPT the cutter EPT to start the chopping job.
Das Programm umfasst einen EPT-Tank, eine EPT-Ölpumpe, zwei EPT-Rohre und zwei Sätze elektromagnetischer Ventile.
EPT der Ölpumpe: 3 kW
EPT-Öl: 40#
SPS-Steuerungssystem
It adopts EPT laptop to handle. The concentrate on piece’s size is adjustable and digit of it can be modified. Computed method has two modes: computerized and guide a single. The technique is straightforward to run and use.
Bearbeitungsgenauigkeit: innerhalb von 1,00 mm
It contains liquid crystal EPT, programmer, transformer for the digital EPTs and kits of every single element. Contact EPT
PLC ist EPTiwan Panasonic
Der Hersteller des Wandlers ist EPTiwan Delta.
The vendor must supply EPT and EPT language EPT
Schalter
Ein bestimmter Zähler misst Größe und Impulse und bestimmt die Größe.
Perform methods
To check out EPT video clip or much more confuse, get in touch with with me
We EPT sell to lots of nations
Unsere Zertifizierung
Organization data
EPT team is a specialist company creating and creating roll forming EPTs estabEPTd in Juni 1996Wir haben 4 Fabriken working in BeiEPTg, TianEPT and ZheJiang province. Far more than four hundred workers supply provider for u.
EPT largely incEPT trapezoidal steel roof/wall panel EPT, C ampZ shape purline EPT, freeway guardrail EPT, sandwich panel manufacturing line, deck forming EPT, C U L ligEPT keel EPT, shutter slat door forming EPT, cutting EPT, downpipe EPT, gutter EPT, and so forth.
Wie können Sie mehr über uns erfahren?
Unsere Dienstleistungen
one. Free technological support and cost-free accessories provide.
2. Engineer available to service EPTry overEPT.
three. 1 yr warranty is presented.
4. EPT daily life complex advice for free of charge.
5. We alwaEPToffer technological assist, fast response, all your inquire will be replied in 24 hours.
Issue amp Reply
one. Q: How to go to our firm:
A: Flug zum Flughafen Peking: Schnelle Vorbereitung von der Südstation Peking zur Weststation Peking
(1 Stunde), dann können wir Sie zur Fabrik bringen (40 Minuten).
B: Fly to ZheJiang Airport: By quick train From ZheJiang XiHu (West Lake) Dis.hu (West Lake) Dis.ao station to HangEPT west
station(4.5 hours), then we can pick up you to factory(40min).
two. Q: What should I supply if I want to customized EPT?
A: U need to have give profile drawing, materials, thickness, voltage and your EPT needs.
Drei. Frage: Wie sieht die Garantie aus?
A: In twelve mounts, all technicals are ready to serve you at any time.
4. F: Was können Sie tun, wenn das EPT defekt ist?
A: Our EPT’s warranty time period is 12 months, if the damaged parts cannot repair, we will deliver
new parts replace the damaged parts free of charge, but you need to have shell out the specific EPT if following warranty interval. we can negotiate to remedy the dilemma, and we source the specialized support for EPT life of tools.
5. Q: If need to have technician to workshop to debug and instruct, how to do?
A: We despatched technician to your place to resolve the EPT. Purchaser should bear EPT incXiHu (West Lake) Dis.Hu (West Lake) Dis.: visa, round trip ticket and ideal accommodation, also purchaser must shell out the wage a hundred USD/working day.

