
Every process, each area, each operate in EPG is demanded to be carried out one particular stage pursuing an additional, cautiously and cautiously, from materials selection, reformation to manufacturing add-ons, from parts warmth treatment method to automated assembly, from top quality handle to merchandise inspection and testing and from buy dealing to right after sales services. We will offer greatest providers and higher high quality goods with all sincerity. We offer you OEM support. Description of 2571 hot market 836 Corrugated Roof Sheet Roll Forming EPT for Guyana
The full corrugated roofing sheet generating EPT line incEPTs de-coiler, main EPT, laptop controlling system and operate out tables. Our EPTs are outfitted with a personal computer managing system. We just system the pieces and size we need to have in the laptop and the wave panel EPT creates it immediately. The EPTs are effortless to operate and working steady.
Similar EPT maybe u like:
Functioning procedure
The complete line incEPTs decoiler, forming EPT, laptop managing technique and run out tables. Our EPTs are equipped with a personal computer managing method to preserve merchandise correct.
Principal parameters
|
いいえ |
選別 |
仕様 | |
|
1 |
未調理の材料 | タイプ | PPGI |
| 給餌幅 | 1250 mm | ||
| 厚さ | .3-.8 mm | ||
|
二 |
デコイラー | 手術 | ガイド |
| WeigEPT容量 | 5トン | ||
|
3 |
体格が非常に良い | ローラーステーション | fifteen row |
| シャフトの直径 | 75mm | ||
| Shaft substance | 45#、0.05mmクロムメッキ | ||
| ローラーの内容 | 45#、0.05mmクロムメッキ | ||
| 親切 | EPTソート | ||
| 体 | 300mm C型ビーム | ||
| 体の厚さ | 16mm | ||
| EPT | Cr 12 | ||
| 手順 | EPT自動 | ||
| Functioning pace | eight-twelve m/min | ||
|
4 |
EPT | 車道 | チェーン1インチ |
| 一次運動 | 5.5kW | ||
| 電圧 | 380V/50Hz、3周期 | ||
|
五 |
コントロールボックス | 電気ボックス | PLC manage program, invEPTr |
| PLCブランド名 | DeltaはEPTiwan製です | ||
| インバーターモデル | DeltaはEPTiwanで作成されました | ||
| 言語 | EPTとEPT | ||
ハンドブック デコイラー
It is passive sort could load coil by expend the blots repair at coil interior diameter. It really is simple to work and inexpensive resolution.
西湖(XiHu)Dis.hu(西湖)Dis.ガジェット
Undertake XiHu (West Lake) Dis.Hu (West Lake) Dis. bar and sliding block to control the width and situation of the steel sheet. The coil is XiHu (West Lake) Dis.Hu (West Lake) Dis.d in the appropriate placement and passed to the roll forming method. Can adjust the XiHu (West Lake) Dis.Hu (West Lake) Dis. bar with loosing the fiXiHu (West Lake) Dis.ng bolts to feed sheet in rigEPT position. It is mounted framework to make positive can not move simply.
ロール成形プログラム:
Roll forming method consist of EPT frame, EPT technique, EPT motor and roll forming technique.
A. EPT frame adopts welding framework with shot blasting and portray treatment
B. All rollers materials adopt higher high quality No. forty five metal, with hard chrome coated on floor, all treatment method by entire CNC EPTs, to make confident the rollers with very good rigidity and precision, and form excellent roofing sheet as for every style.
C. All rolling shafts are created by large quality No. forty five metal with quench and mood treatment, so the shafts with great rigidity which could use for EPT tern without deformation.
D. ローリングシャフト支持構造は鋼壁構造で、基礎部分と一体的に溶接されており、剛性を確保している。
E. Cycloidal pin EPT velocity EPT motor EPTn, the again/EPT roller EPTn by EPT, part of upper/reduce rollers EPTn by EPT
F. Change the screw bar manually to change the distance between upper/decrease rollers for difference thickness of sheet.
(Consideration: all rolling system has adjusted in our business as a excellent circumstance, we do not propose to alter the rollers at random, if required, must modify by a skilled technician or soon after teach by our engineer. Otherwise will result in the EPT can not sort a very good profile
Cutting gadget
A. Adopts post chopping, the reducing blade substance is Cr12 with quenched remedy, after slicing, there is no material squandered.
B. 溶接構造を採用し、高い剛性を実現しています。
C. The reducing action is droved by the EPT from EPT station which ensures the procession of the slicing and minimal noisy, EPT life.
EPTプログラム
It is managed by EPT wheel oil pump. Following filling the EPT oil into the EPT oil tank, the pumps EPT the cutter EPT to start the chopping job.
このプログラムには、EPTタンク一式、EPTオイルポンプ一式、EPTパイプ2本、および電磁弁2セットが含まれています。
オイルポンプのEPT:3kW
EPTオイル:40#
PLC制御システム
It adopts EPT laptop to handle. The concentrate on piece’s size is adjustable and digit of it can be modified. Computed method has two modes: computerized and guide a single. The technique is straightforward to run and use.
加工精度:1.00mm以内
It contains liquid crystal EPT, programmer, transformer for the digital EPTs and kits of every single element. Contact EPT
PLCはEPTiwan Panasonicです
トランスデューサーの製造元はEPTiwan Deltaです。
The vendor must supply EPT and EPT language EPT
カウンタ
ある特定のカウンターは、サイズを測定し、パルスを発信し、サイズを決定します。
メソッドを実行する
To check out EPT video clip or much more confuse, get in touch with with me
We EPT sell to lots of nations
当社の認証
Organization data
EPT team is a specialist company creating and creating roll forming EPTs estabEPTd in 1996年6月。 我々は持っています 4つの工場 working in BeiEPTg, TianEPT and ZheJiang province. Far more than four hundred workers supply provider for u.
EPT largely incEPT trapezoidal steel roof/wall panel EPT, C ampZ shape purline EPT, freeway guardrail EPT, sandwich panel manufacturing line, deck forming EPT, C U L ligEPT keel EPT, shutter slat door forming EPT, cutting EPT, downpipe EPT, gutter EPT, and so forth.
弊社について調べるにはどうすればいいですか?
当社のサービス
one. Free technological support and cost-free accessories provide.
2. Engineer available to service EPTry overEPT.
three. 1 yr warranty is presented.
4. EPT daily life complex advice for free of charge.
5. We alwaEPToffer technological assist, fast response, all your inquire will be replied in 24 hours.
Issue amp Reply
one. Q: How to go to our firm:
A:北京空港へのフライト:北京南駅から杭西駅まで素早く準備します
(1時間)後、工場までご案内できます(40分)。
B: Fly to ZheJiang Airport: By quick train From ZheJiang XiHu (West Lake) Dis.hu (West Lake) Dis.ao station to HangEPT west
station(4.5 hours), then we can pick up you to factory(40min).
two. Q: What should I supply if I want to customized EPT?
A: U need to have give profile drawing, materials, thickness, voltage and your EPT needs.
3.Q:保証とは何ですか?
A: In twelve mounts, all technicals are ready to serve you at any time.
4. 質問:EPTが故障した場合、どうすればよいですか?
A: Our EPT’s warranty time period is 12 months, if the damaged parts cannot repair, we will deliver
new parts replace the damaged parts free of charge, but you need to have shell out the specific EPT if following warranty interval. we can negotiate to remedy the dilemma, and we source the specialized support for EPT life of tools.
5. Q: If need to have technician to workshop to debug and instruct, how to do?
A: We despatched technician to your place to resolve the EPT. Purchaser should bear EPT incXiHu (West Lake) Dis.Hu (West Lake) Dis.: visa, round trip ticket and ideal accommodation, also purchaser must shell out the wage a hundred USD/working day.

