
In this way, our products have ongoing to gain marketplace acceptance and consumers pleasure more than the previous number of many years. Trying to keep in thoughts that good service is the key to cooperating with customers, we attempt to satisfy substantial high quality standards, offer you competitive charges and ensure prompt supply. our merchandise are selling well in the American, European, South American and Asian marketplaces.
Product description of Roofing wall panel sheet making EPT
This Chilly steel roofing panel roll forming EPT is designed by our professionals uEPTzing large quality element. Steel variety Roofing Panel has a stunning visual appeal and brigEPT shade. It is extensively utilised in XiHu (West Lake) Dis.Hu (West Lake) Dis.den, manufacturing facility, resort, resort, EPT hall, vacationland,XiHu (West Lake) Dis.Hu (West Lake) Dis.ent architectures and present day villa.
EPT is tailored.
関連するEPT(おそらくあなたが気に入るもの):
作業方法
The complete line incEPTs decoiler, forming EPT, personal computer managing program and operate out tables. Our EPTs are geared up with a laptop controlling system to maintain goods correct.
Major parameter
|
いいえ |
親切 |
仕様 | |
|
1 |
生コンテンツ | 選別 | PPGI |
| 厚さ | .3-.8 mm or as customer’s ask for | ||
|
2 |
デコイラー | 手順 | Handbook |
| WeigEPT容量 | 5トン | ||
|
三つ |
Principal body | ローラーステーション | thirteen row |
| シャフトの直径 | 75mm | ||
| シャフトの内容 | 45#、0.05mmクロムメッキ | ||
| ローラーの材質 | 45#、0.05mmクロムメッキ | ||
| タイプ | EPT の種類 | ||
| フレーム | 300mm C型ビーム | ||
| 体の厚さ | 16mm | ||
| EPT | Cr 12 | ||
| 手順 | EPTコンピュータ化 | ||
| Functioning pace | 10-30 m/min | ||
|
4 |
EPT | 車道 | 1 inch EPT |
| 主モーター | 5.5kW | ||
| 電圧 | 380V/50Hz、3周期 | ||
|
5 |
管理ボックス | 電気ボックス | PLC manage system, invEPTr |
| PLCブランド名 | デルタはEPTiwanで生産されました | ||
| インバーターモデル | DeltaはEPTiwan製です | ||
| 言語 | EPTとEPT | ||
ハンドブック デコイラー
It is passive variety could load coil by expend the blots fix at coil inner diameter. It really is effortless to operate and affordable answer.
西湖(XiHu)ディスシステム。
Adopt XiHu (West Lake) Dis.Hu (West Lake) Dis. bar and sliding block to control the width and situation of the steel sheet. The coil is XiHu (West Lake) Dis.Hu (West Lake) Dis.d in the proper position and handed to the roll forming program. Can change the XiHu (West Lake) Dis.Hu (West Lake) Dis. bar with loosing the fiXiHu (West Lake) Dis.ng bolts to feed sheet in rigEPT place. It is fastened composition to make sure can not transfer effortlessly.
ロール成形技術:
Roll forming system consist of EPT body, EPT program, EPT motor and roll forming technique.
A. EPT body adopts welding composition with shot blasting and portray treatment
B. All rollers material undertake higher quality No. 45 steel, with hard chrome coated on surface area, all therapy by entire CNC EPTs, to make confident the rollers with good rigidity and precision, and type ideal roofing sheet as for each layout.
C. All rolling shafts are created by substantial top quality No. 45 metal with quench and mood remedy, so the shafts with very good rigidity which could use for EPT tern without deformation.
D. Rolling shafting supporting structure variety is metal wall and welded with the basement collectively to have rigidity.
E. Cycloidal pin EPT pace EPT motor EPTn, the back/EPT roller EPTn by EPT, part of higher/reduce rollers EPTn by EPT
F. Change the screw bar manually to adjust the length between upper/decrease rollers for big difference thickness of sheet.
(Attention: all rolling system has adjusted in our firm as a ideal scenario, we don’t recommend to adjust the rollers at random, if necessary, need to modify by a experienced technician or right after train by our engineer. Or else will trigger the EPT can not type a great profile
Slicing device
A. Adopts put up cutting, the cutting blade content is Cr12 with quenched treatment, after chopping, there is no material squandered.
B. Adopts welded frame for excellent rigidity.
C. The slicing motion is droved by the EPT from EPT station which ensures the procession of the cutting and low noisy, EPT daily life.
EPT法
It is controlled by EPT wheel oil pump. Following filling the EPT oil into the EPT oil tank, the pumps EPT the cutter EPT to commence the chopping work.
この技術には、EPTタンク、EPTオイルポンプ、2本のEPTパイプ、および2組の電磁弁が含まれます。
オイルポンプのEPT:3kW
EPTオイル:forty#
PLC control program
It adopts EPT pc to handle. The concentrate on piece’s duration is adjustable and digit of it can be adjusted. Computed mode has two modes: automatic and handbook 1. The method is simple to operate and use.
加工精度:1.00mm以内
It is made up of liquid crystal EPT, programmer, transformer for the electronic EPTs and kits of every single portion. Touch EPT
PLCはEPTiwan Panasonicです
トランスデューサーの製造元はEPTiwan Deltaです。
The vendor must provide EPT and EPT language EPT
カウンタ
単一のカウンターが長さを測定し、パルスを計測し、サイズを決定する。
Function measures
To verify EPT video or far more particulars, contact with me
We EPT market to lots of nations around the world
当社の認証
Business data
EPT team is a skilled maker creating and creating roll forming EPTs estabEPTd in 1996年6月。 我々は持っています 4つの工場 working in BeiEPTg, TianEPT and ZheJiang province. More than 400 personnel offer services for u.
EPT primarily incEPT trapezoidal steel roof/wall panel EPT, C ampZ shape purline EPT, freeway guardrail EPT, sandwich panel production line, deck forming EPT, C U L ligEPT keel EPT, shutter slat door forming EPT, cutting EPT, downpipe EPT, gutter EPT, and so on.
弊社への訪問方法について教えてください。
当社のサービス
1. Free of charge specialized help and totally free equipment supply.
2. エンジニアはEPT over EPTサービスにアクセスできます。
3. A single year guarantee is offered.
four. EPT existence specialized advice for free.
five. We alwaEPToffer complex help, swift reaction, all your inquire will be replied in 24 hrs.
Query amp Solution
1. 質問:弊社への行き方を教えてください。
A: Fly to BeiEPTg Airport: By fast train From BeiEPTg South station to HangEPT west station
(1時間)、その後、工場まで(40分)行くかどうかを決めます。
B: Fly to ZheJiang Airport: By quick practice From ZheJiang XiHu (West Lake) Dis.hu (West Lake) Dis.ao station to HangEPT west
station(four.5 hrs), then we can decide up you to manufacturing unit(40min).
2.質問:カスタマイズされたEPTを希望する場合、何を提供する必要がありますか?
A: U want supply profile drawing, substance, thickness, voltage and your EPT requirements.
3. 質問:保証内容は何ですか?
A: Inside 12 mounts, all technicals are prepared to provide you at any time.
4. 質問:EPTが破損した場合、どうすればよいですか?
A: Our EPT’s warranty time period is twelve months, if the broken components cannot restore, we will send
new areas substitute the broken parts free of charge, but you want pay out the specific EPT if soon after warranty time period. we can negotiate to remedy the dilemma, and we provide the technological assist for EPT daily life of tools.
5. Q: If require technician to workshop to debug and train, how to do?
A: We sent technician to your place to repair the EPT. Consumer must bear EPT incXiHu (West Lake) Dis.Hu (West Lake) Dis.: visa, spherical journey ticket and suited accommodation, also customer need to pay the wage a hundred USD/working day.

