
Our items are applied in a lot of fields. Services & Good quality controlWe offer thorough drawings and supply whenever required. Additionally, all our production processes are in compliance with ISO9002 expectations.
EPTTtruk HOMAN four times2 tripper EPTT, 6 ton
ZZ3048D3214C143R/J5W-4102BN23Y2865M
Motor: YN4102QBZL, Euro II,116Hp,
Equipment box: WLY10H46,5F amp1R
Tire: eight.25R16 times7,
Cabin: 1880mm, with AC REPTT
Wheel base: 3200mm
Front/rear Axle:two.8T/6.5T(six.833)
Chassis:230/800
Gas tank:120L
EPTT system:a hundred and ten double lifting
Dimension: 3600 times2100 times800mm
Ability: 6T
EPTTパラメータ
| キャビン | Radio FM with USB,REPTT , photo for reference | |
| Vehicle Major Proportions | General proportions (L x W x H)mm | 6400 times2300 times2650 |
| Wheel base (mm) | 3360 | |
| Excess weight in KGS | EPTTre Bodyweight | 5500 |
| ペイロード | 8000 | |
| Entrance axles loading potential | 1×5000 | |
| Rear axles loading potential | 1×10000 | |
| Max. driving pace(km/h) | 85 | |
| モーター | ブランド | YC |
| 製品 | YC4E130 | |
| 親切 | Euro-2 emission, intercooler, turbocharge | |
| 馬のEPTT | a hundred thirty HP | |
| Max Torque | 420 N.m | |
| EPTT | WLY, six EPTTs EPTT amp 1 reverse EPTT | |
| ブレーキ | Twin circuit compressed air brake | |
| 操舵 | EPTTステアリング | |
| タイヤ | nine.00R20 all metal radial tyre with a single spare | |
| Cargo Body | 3850 x 2200 x 1000mm,side three mm and floor four mm thick, effective volume eight cb | |
| EPTTシステム | Center Raise Cylinder | |
Our Edge
one.Aggressive Factory Value and Outstanding EPTT
two.Much more than 20 years’ experience as a producer
three.EPTT EPTT Certification SGS CCC ISO
four.Perfect soon after-sale services
5.Custom-made items obtainable with us
6.Export to more than 50 international locations and areas
seven.Oversea wareshouse with more than 100000 US dollors spare areas in inventory
eight.Oversea place of work with much more than fifteen expert engineers to aid nearby buyers
一次産品
1. ダンプEPTT / ティッパーEPTT
2. Fire Fighting EPTT / Hearth EPTT / Fireplace Vehicle / Hearth Motor
3. クレーン付きEPTT/クレーン搭載EPTT
4. Oil EPTTnk EPTT / Gas EPTTnker EPTT
5. Drinking water EPTT / Drinking water EPTTnk EPTT / Water Sprinkler EPTT
6. Concrete Mixer EPTT
7. バンEPTT / 絶縁EPTT / EPTT EPTT
8. 便吸引EPTT / 汚水吸引EPTT
9. Cement Powder EPTTnk EPTT/ Bulk cement EPTT
10. Large-altitude operation EPTT
eleven. Self-loading XiHu (West Lake) Dis.Hu (West Lake) Dis.bage EPTT, XiHu (West Lake) Dis.Hu (West Lake) Dis.bage compactor EPTT, sealed XiHu (West Lake) Dis.Hu (West Lake) Dis.bage EPTT,
12. Semi Trailer ( flat bed trailer / skeEPTTn trailer / dump semi trailer / side wall trailer / reduced bed trailer / van container trailer / warehouse trailer, and many others. )
よくある質問
1. 最小注文数量:1台
2. Optional payment phrases: T/T or L/C
T/T: 30% deposit by T/T, 70% equilibrium should be paid out before shippment.
信用状:30%はEPTT払い、70%は一覧払い信用状。
three. Components of well-known manufacturer can be adopted by your need, this sort of as WABCO, JOST, BPW, FUWA.
four. Shipping time: Within15 workdays after acquiring 30% deposit of T/T
保証
one. A single calendar year good quality promise for a few key areas axles, engine, EPTT or inside 100000km, which will come the first.
two. Other spare component could be supplied by OEM at EPTT costs.
3. Often callback to know the vehicle’s functioning standing.
four. The overEPTT engineers are usually completely ready to offer with surprising needs.
Your are always welcome to go to our manufacturing unit at any time.

