
We inspect every piece of bearing by ourselves before shipping. guarantees the security and regularity of the key function of components. Our item assortment also addresses locking assemblies (clamping factors/locking device), taper bushes, QD bushes, bolt-on hubs, torque limiters, shaft collars, motor bases and motor slides, chain detachers, chain guides, common joint, rod finishes and yokes.
| Descripción del Producto |
Our EPT has numerous items for your deciding on and we can produce as per your drawing or sample to meet your EPT request
1. Massive output torque
2. Risk-free, dependable, cost-effective and tough
three. Secure EPT, tranquil procedure
four. Large carrying ability
five. Large modularization design and style, may equip with various outer EPT enter conveniently. Exact same EPT sort might equip with various EPT motor. It is straightforward to realize the mixture and junction between each EPT variety
six. EPT ratio: Wonderful division, vast scope. The blended EPT variety might type really large EPT ratio, i. E. Output very lower rotary speed.
seven. Form of set up: The place to be set up is not minimal.
eight. Substantial energy, compact the box entire body of substantial strength cast iron, EPT and EPT shaft adapts the fuel carbonization, quenching and fantastic grinding method, as a result the bearing capability of device volume is substantial.
9. EPT existence: UnEPTthe issue of correct kind decided on(incXiHu (West Lake) Dis.Hu (West Lake) Dis. selecting appropriate procedure parament ) standard procedure and upkeep, the lifestyle if main components velocity EPT(besides donning parts)ought to not be significantly less than 20000 several hours. The putting on parts incEPT lubricating oil, oil seal and bearing.
10. Minimal sound: Since major parts of pace EPT are processed, and analyzed critically, consequently the noise of velocity EPT is minimal.
11.Our EPT box have achieved the EPT worldwide amount, can replace the identical kind of items EPTed.
|
Medición |
Relación |
A |
B |
mi |
F |
H |
METRO |
norte |
|
cuarenta |
1/5 one/10 one/15 one/twenty 1/twenty five 1/thirty 1/forty 1/fifty one/sixty |
142 |
ochenta y cinco |
70 |
ochenta |
ciento treinta y cinco |
90 |
cien |
|
cincuenta |
ciento setenta y cinco |
ciento cinco |
noventa y cinco |
ciento diez |
ciento ochenta |
120 |
ciento cuarenta |
|
|
60 |
195 |
120 |
ciento cinco |
ciento veinte |
205 |
130 |
ciento cincuenta |
|
|
70 |
234 |
ciento cuarenta |
ciento quince |
ciento cincuenta |
235 |
ciento cincuenta |
190 |
|
|
80 |
264 |
160 |
135 |
180 |
265 |
ciento setenta |
220 |
|
|
100 |
300 |
178 |
155 |
220 |
327 |
ciento noventa |
260 |
|
|
120 |
385 |
230 |
180 |
260 |
388 |
230 |
320 |
|
|
ciento treinta y cinco |
435 |
260 |
doscientos |
290 |
445 |
250 |
350 |
|
|
155 |
507 |
300 |
220 |
320 |
483 |
280 |
390 |
|
|
175 |
550 |
325 |
250 |
350 |
550 |
310 |
430 |
|
|
200 |
594 |
350 |
290 |
390 |
610 |
360 |
480 |
|
|
250 |
710 |
420 |
380 |
480 |
755 |
460 |
560 |
|
Tamaño |
GRAMO |
Z |
Eje de entrada |
Eje de salida |
WeigEPT Kg |
Oil Fat |
||
|
HS |
U |
LS |
S |
|||||
|
40 |
12 |
diez |
Veinticinco |
doce |
28 |
14 |
tres.ocho |
|
|
cincuenta |
quince |
11 |
treinta |
12 |
cuarenta |
17 |
7 |
cuatro |
|
60 |
veinte |
once |
40 |
15 |
50 |
22 |
10.five |
.cinco |
|
70 |
Veinticinco |
15 |
cuarenta |
18 |
sesenta |
28 |
catorce.5 |
.Siete |
|
ochenta |
Veinticinco |
15 |
50 |
22 |
sesenta y cinco |
32 |
22 |
uno.1 |
|
100 |
Veinticinco |
quince |
cincuenta |
25 |
setenta y cinco |
38 |
36 |
dos.3 |
|
ciento veinte |
treinta |
18 |
sesenta y cinco |
treinta |
ochenta y cinco |
Cuarenta y cinco |
63 |
4.five |
|
135 |
30 |
18 |
setenta y cinco |
35 |
noventa y cinco |
cincuenta y cinco |
80 |
6. |
|
ciento cincuenta y cinco |
38 |
20 |
85 |
40 |
ciento diez |
sesenta |
114 |
seis.2 |
|
175 |
cuarenta |
20 |
85 |
Cuarenta y cinco |
110 |
65 |
ciento cincuenta |
ocho. |
|
200 |
42 |
22 |
noventa y cinco |
50 |
ciento veinticinco |
70 |
218 |
nueve. |
|
250 |
48 |
27 |
ciento diez |
60 |
155 |
noventa |
363 |
17. |
|
Tamaño |
Relación |
A |
B |
E1 |
E2 |
F |
GRAMO |
METRO |
norte |
|
40 |
one/five one/10 one/15 1/20 one/25 1/30 one/40 one/50 one/60 |
142 |
ochenta y cinco |
setenta y dos |
85 |
75 |
12 |
179 |
97 |
|
cincuenta |
175 |
ciento cinco |
93 |
102 |
noventa |
catorce |
220 |
116 |
|
|
sesenta |
195 |
ciento veinte |
ciento cinco |
ciento veinte |
ciento |
15 |
260 |
126 |
|
|
70 |
234 |
ciento cuarenta |
ciento veinte |
ciento treinta y cinco |
120 |
veinte |
295 |
156 |
|
|
ochenta |
264 |
ciento sesenta |
ciento treinta |
150 |
ciento cuarenta |
veinte |
320 |
176 |
|
|
ciento |
trescientos |
178 |
ciento cincuenta y cinco |
ciento ochenta |
ciento noventa |
30 |
375 |
226 |
|
|
ciento veinte |
385 |
230 |
185 |
215 |
220 |
treinta |
450 |
266 |
|
|
ciento treinta y cinco |
435 |
260 |
210 |
235 |
260 |
35 |
495 |
306 |
|
|
ciento cincuenta y cinco |
507 |
300 |
245 |
295 |
290 |
Cuarenta y cinco |
590 |
350 |
|
|
ciento setenta y cinco |
550 |
325 |
267 |
323 |
320 |
45 |
640 |
394 |
|
|
200 |
594 |
350 |
290 |
360 |
370 |
42 |
710 |
440 |
|
|
250 |
710 |
420 |
350 |
440 |
440 |
cuarenta y seis |
860 |
510 |
|
Dimensiones |
Z |
Enter Shaft |
Eje de salida |
WeigEPT Kg |
Oil WeigEPT L |
||
|
HS |
U |
LS |
S |
||||
|
40 |
10 |
Veinticinco |
doce |
28 |
catorce |
tres.ocho |
.35 |
|
cincuenta |
once |
treinta |
12 |
40 |
diecisiete |
six.five |
.cinco |
|
60 |
11 |
cuarenta |
quince |
cincuenta |
22 |
9 |
.6 |
|
70 |
15 |
40 |
18 |
sesenta |
28 |
catorce |
1.uno |
|
80 |
quince |
cincuenta |
22 |
sesenta y cinco |
32 |
21 |
1.forty four |
|
ciento |
15 |
cincuenta |
25 |
setenta y cinco |
38 |
33 |
3. |
|
ciento veinte |
dieciocho |
65 |
treinta |
ochenta y cinco |
45 |
cincuenta y uno |
five.one |
|
135 |
18 |
setenta y cinco |
35 |
95 |
cincuenta y cinco |
setenta y cinco |
siete.dos |
|
155 |
20 |
ochenta y cinco |
40 |
ciento diez |
60 |
ciento quince |
nueve. |
|
ciento setenta y cinco |
veinte |
ochenta y cinco |
45 |
110 |
65 |
143 |
10 |
|
doscientos |
22 |
noventa y cinco |
cincuenta |
125 |
70 |
200 |
12 |
|
250 |
27 |
110 |
60 |
ciento cincuenta y cinco |
90 |
345 |
22 |
|
Medición |
Relación |
A |
B |
E1 |
E2 |
F |
GRAMO |
METRO |
norte |
|
40 |
1/5 1/10 one/15 1/20 1/twenty five one/thirty 1/forty 1/50 1/sixty |
142 |
114 |
setenta y dos |
85 |
75 |
doce |
179 |
97 |
|
50 |
ciento setenta y cinco |
145 |
noventa y tres |
102 |
noventa |
catorce |
220 |
116 |
|
|
60 |
195 |
ciento sesenta y cinco |
ciento cinco |
120 |
ciento |
15 |
260 |
126 |
|
|
70 |
234 |
195 |
120 |
ciento treinta y cinco |
ciento veinte |
veinte |
295 |
156 |
|
|
80 |
264 |
210 |
130 |
150 |
ciento cuarenta |
20 |
320 |
176 |
|
|
cien |
trescientos |
253 |
ciento cincuenta y cinco |
180 |
ciento noventa |
treinta |
375 |
226 |
|
|
ciento veinte |
385 |
285 |
185 |
215 |
220 |
30 |
450 |
266 |
|
|
135 |
435 |
320 |
210 |
235 |
260 |
35 |
495 |
306 |
|
|
ciento cincuenta y cinco |
507 |
392 |
245 |
295 |
290 |
45 |
590 |
350 |
|
|
ciento setenta y cinco |
550 |
412 |
267 |
323 |
320 |
45 |
640 |
394 |
|
|
doscientos |
594 |
480 |
290 |
360 |
370 |
cuarenta y dos |
710 |
440 |
|
|
250 |
710 |
560 |
350 |
440 |
440 |
46 |
860 |
510 |
|
Tamaño |
Z |
Enter Shaft |
Eje de salida |
WeigEPT Kg |
Oil WeigEPT L |
||
|
HS |
U |
LS |
S |
||||
|
cuarenta |
10 |
Veinticinco |
12 |
28 |
14 |
tres.8 |
.35 |
|
cincuenta |
11 |
treinta |
12 |
40 |
diecisiete |
six.five |
.5 |
|
sesenta |
once |
40 |
15 |
cincuenta |
22 |
nueve |
.6 |
|
70 |
quince |
40 |
18 |
sesenta |
28 |
14 |
1.1 |
|
80 |
quince |
cincuenta |
22 |
65 |
32 |
21 |
1.44 |
|
cien |
quince |
50 |
25 |
setenta y cinco |
38 |
33 |
3. |
|
120 |
dieciocho |
sesenta y cinco |
30 |
ochenta y cinco |
Cuarenta y cinco |
51 |
5.1 |
|
135 |
dieciocho |
75 |
35 |
noventa y cinco |
cincuenta y cinco |
setenta y cinco |
siete.2 |
|
ciento cincuenta y cinco |
20 |
85 |
40 |
110 |
sesenta |
ciento quince |
9. |
|
ciento setenta y cinco |
20 |
ochenta y cinco |
45 |
110 |
65 |
143 |
10 |
|
doscientos |
22 |
noventa y cinco |
cincuenta |
ciento veinticinco |
70 |
200 |
doce |
|
250 |
27 |
110 |
sesenta |
ciento cincuenta y cinco |
noventa |
345 |
22 |
HangEPT EPT Industry Co., Ltd. is a EPTized supplier of a entire selection of EPTs, sprockets, EPTs, EPT racks, v belt pulley, timing pulley, V-belts, couplings, EPTd components and so on.
Due to our sincerity in giving ideal service to our customers, understXiHu (West Lake) Dis.Hu (West Lake) Dis. of your demands and overriding sense of duty toward filling buying needs, we have acquired the EPT of consumers worldwide. Having accrued precious encounter in cooperating with foreign consumers, our goods are marketing well in the American, European, South American and Asian markets. Our merchandise are made by modern day computerized EPTry and gear. In the meantime, our merchandise are manufactured according to high quality stXiHu (West Lake) Dis.Hu (West Lake) Dis.rds, and complying with the worldwide EPT stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd standards.
With many years’ encounter in this line, we will be EPTed by our positive aspects in competitive price tag, one-time supply, prompt response, on-hand engineering support and very good soon after-sales companies.
In addition, all our production techniques are in compliance with ISO9001 stXiHu (West Lake) Dis.Hu (West Lake) Dis.rds. We also can design and style and make non-stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd products to fulfill customers’ EPT needs. EPT and credit history are the bases that make a company alive. We will offer best providers and large quality merchandise with all sincerity. If you want any details or samples, make sure you contact us and you will have our before long reply.
Preguntas frecuentes:
P1: ¿Son ustedes una empresa comercial o un fabricante?
A: Somos una fábrica.
Q2: How EPT is your shipping and delivery time and shipment?
one.Sample EPT-occasions: EPTly 10 workdays.
two.Manufacturing EPT-occasions: 20-40 workdaEPTafter obtaining your deposit.
P3. ¿Cuáles son sus condiciones de pago?
A: T/T 30% as deposit, and 70% just before supply.
This autumn: What is your advantages?
one. Company,the most aggressive cost and very good quality.
two. Excellent specialized engineers give you the best assistance.
3. OEM is offered.
four. Abundant inventory and fast supply.
Q5. If you can not locate the solution on our website,what do you following?
You should ship us inquiry with product photos and drawings by electronic mail or other waEPTand we will verify.

